Dependency Graph - Phase Execution Order
Visual Phase Dependencies
START
│
├─────────────────────────────────────────────┐
│ │
▼ ▼
┌─────────────────────────┐ ┌─────────────────────────┐
│ PHASE 4: Config │ │ PHASE 9: Docs │
│ Agent: config-agent │ │ Agent: docs-agent │
│ Duration: 20-30 min │ │ Duration: 30-40 min │
└────────────┬────────────┘ └─────────────────────────┘
│ (Parallel - no deps)
│ Blocks: infra-agent, backend-agent
│
├────────────────────┬─────────────────────┐
│ │ │
▼ ▼ ▼
┌─────────────────────┐ ┌─────────────────────┐ ┌─────────────────────┐
│ PHASE 1: Docker │ │ PHASE 2: Remove │ │ PHASE 3: Storage │
│ Agent: infra-agent │ │ Tenant │ │ Agent:storage-agent │
│ Duration: 25-30min │ │ Agent:backend-agent │ │ Duration: 30-40min │
└──────────┬──────────┘ └──────────┬──────────┘ └─────────────────────┘
│ │ (Parallel)
│ │
│ Blocks platform-agent │
│ │
├───────────┐ ├───────────┐
│ │ │ │
▼ ▼ ▼ ▼
┌─────────────────┐ ┌──────────────────┐ ┌─────────────────┐
│ PHASE 5: │ │ PHASE 8: │ │ PHASE 6: │
│ Network │ │ Platform │ │ Backend │
│ Agent: infra │ │ Agent: platform │ │ Agent: backend │
│ Duration:15min │ │ Duration:35-45m │ │ Duration:20min │
└────────┬────────┘ └──────────────────┘ └────────┬────────┘
│ │
│ │ Blocks frontend-agent
▼ │
┌─────────────────┐ │
│ PHASE 7: │ │
│ Database │ │
│ Agent: infra │ │
│ Duration:15min │ │
└─────────────────┘ │
▼
┌─────────────────────┐
│ PHASE 10: Frontend │
│ Agent: frontend │
│ Duration: 25-35min │
└──────────┬──────────┘
│
│
All phases must complete before testing
│
▼
┌─────────────────────┐
│ PHASE 11: Testing │
│ Agent: test-agent │
│ Duration: 20-30min │
└─────────────────────┘
│
▼
END
Phase Dependency Matrix
| Phase | Agent | Depends On | Blocks | Can Run Parallel With |
|---|---|---|---|---|
| 4 | config-agent | None | 1, 2 | 9 |
| 9 | docs-agent | None | None | 4, 1, 2, 3, 5, 6, 7, 8, 10 |
| 1 | infra-agent | 4 | 5, 7, 8 | 2, 3, 9 |
| 2 | backend-agent | 4 | 6, 10 | 1, 3, 9 |
| 3 | storage-agent | None | None | 1, 2, 4, 9, 5, 6, 7, 8 |
| 5 | infra-agent | 1 | 7 | 2, 3, 6, 8, 9 |
| 6 | backend-agent | 2 | 10 | 1, 3, 5, 7, 8, 9 |
| 7 | infra-agent | 5 | None | 2, 3, 6, 8, 9 |
| 8 | platform-agent | 1 | None | 2, 3, 5, 6, 7, 9 |
| 10 | frontend-agent | 6 | 11 | 9 (tail end) |
| 11 | test-agent | ALL | None | None |
Critical Path Analysis
Longest Path (Sequential)
Phase 4 (30m) → Phase 2 (20m) → Phase 6 (20m) → Phase 10 (30m) → Phase 11 (25m)
Total: 125 minutes (2 hours 5 minutes)
Parallel Optimization
With 8 agents working in parallel:
Wave 1: Max(Phase 4: 30m, Phase 9: 40m) = 40 minutes
Wave 2: Max(Phase 1: 30m, Phase 2: 20m, Phase 3: 40m) = 40 minutes
Wave 3: Max(Phase 5: 15m, Phase 6: 20m, Phase 7: 15m, Phase 8: 45m) = 45 minutes
Wave 4: Phase 10: 30 minutes
Wave 5: Phase 11: 25 minutes
Total: 180 minutes (3 hours)
Note: Critical path runs through: Phase 9 → Phase 3 → Phase 8 → Phase 10 → Phase 11
Agent Execution Waves
Wave 1: Foundation (Parallel)
Start Time: T+0 Duration: 40 minutes
| Agent | Phase | Duration | Start | End |
|---|---|---|---|---|
| config-agent | 4 | 30 min | T+0 | T+30 |
| docs-agent | 9 | 40 min | T+0 | T+40 |
Completion Signal: Both agents update EXECUTION-STATE.json status to "completed"
Wave 2: Core Infrastructure (Parallel)
Start Time: T+30 (after config-agent completes) Duration: 40 minutes
| Agent | Phase | Duration | Start | End |
|---|---|---|---|---|
| infra-agent | 1 | 30 min | T+30 | T+60 |
| backend-agent | 2 | 20 min | T+30 | T+50 |
| storage-agent | 3 | 40 min | T+30 | T+70 |
Waits For: config-agent completion Completion Signal: All three agents complete their first phases
Wave 3: Continued Work (Parallel)
Start Time: Varies by agent Duration: 45 minutes
| Agent | Phase | Duration | Start | End | Waits For |
|---|---|---|---|---|---|
| infra-agent | 5 | 15 min | T+60 | T+75 | Phase 1 |
| backend-agent | 6 | 20 min | T+50 | T+70 | Phase 2 |
| platform-agent | 8 | 45 min | T+60 | T+105 | Phase 1 |
Then:
| Agent | Phase | Duration | Start | End | Waits For |
|---|---|---|---|---|---|
| infra-agent | 7 | 15 min | T+75 | T+90 | Phase 5 |
Completion Signal: All agents finish their assigned phases
Wave 4: Frontend (Sequential)
Start Time: T+70 (after backend-agent Phase 6) Duration: 30 minutes
| Agent | Phase | Duration | Start | End | Waits For |
|---|---|---|---|---|---|
| frontend-agent | 10 | 30 min | T+70 | T+100 | Phase 6 |
Waits For: backend-agent Phase 6 completion Completion Signal: frontend-agent updates status
Wave 5: Validation (Sequential)
Start Time: T+105 (after all agents complete) Duration: 25 minutes
| Agent | Phase | Duration | Start | End | Waits For |
|---|---|---|---|---|---|
| test-agent | 11 | 25 min | T+105 | T+130 | ALL phases |
Waits For: platform-agent Phase 8 (last to complete) Completion Signal: All tests pass, project simplified
Resource Conflict Analysis
File-Level Conflicts
None Detected - All agents work on different files or in sequence.
Potential Race Conditions
Docker Compose Access:
- Only infra-agent modifies docker-compose.yml
- Sequential phases (1, 5, 7) prevent conflicts
- Risk: Low
Config File Access:
- Only config-agent modifies config/app/production.yml
- Single phase (4) prevents conflicts
- Risk: None
Backend Code Access:
- backend-agent works on different files in Phase 2 vs. Phase 6
- storage-agent works on different files (storage/ vs. backend)
- Risk: None
Lock File Strategy
If conflicts arise (they shouldn't):
# Agent 1 creates lock
touch docs/redesign/locks/docker-compose.yml.lock
# Agent 2 checks for lock
if [ -f docs/redesign/locks/docker-compose.yml.lock ]; then
wait_for_lock_release
fi
# Agent 1 releases lock
rm docs/redesign/locks/docker-compose.yml.lock
Synchronization Points
Critical Handoffs
-
config-agent → infra-agent, backend-agent
- What: Configuration cleanup complete
- Why: Backend and infra need clean config to work
- Check: EXECUTION-STATE.json phase 4 status = "completed"
-
infra-agent Phase 1 → platform-agent Phase 8
- What: Docker compose updated with new names
- Why: Platform service needs new container names
- Check: EXECUTION-STATE.json phase 1 status = "completed"
-
backend-agent Phase 6 → frontend-agent Phase 10
- What: Backend API updates complete
- Why: Frontend needs updated API contracts
- Check: EXECUTION-STATE.json phase 6 status = "completed"
-
All Agents → test-agent Phase 11
- What: All code changes complete
- Why: Testing validates entire simplification
- Check: EXECUTION-STATE.json phases 1-10 all "completed"
Bottleneck Analysis
Potential Bottlenecks
-
platform-agent Phase 8 (45 minutes)
- Longest single phase
- Blocks final testing
- Mitigation: Start as early as possible (after Phase 1)
-
config-agent Phase 4 (30 minutes)
- Blocks Wave 2 start
- Mitigation: First wave priority, simple changes
-
storage-agent Phase 3 (40 minutes)
- Not on critical path but moderately long
- Mitigation: Can run fully parallel
Optimization Opportunities
- Start docs-agent immediately - No dependencies, can run entire duration
- Prioritize config-agent - Unblocks Wave 2 quickly
- Start storage-agent early - Long duration, no dependencies
- Stagger infra-agent phases - Phases 1, 5, 7 run sequentially within agent
Decision Points
Proceed to Next Wave
Wave 1 → Wave 2:
IF EXECUTION-STATE.json phase 4 status == "completed"
THEN spawn Wave 2 agents
ELSE wait
Wave 2 → Wave 3:
IF EXECUTION-STATE.json phase 1 status == "completed"
THEN spawn platform-agent
CONTINUE infra-agent to Phase 5
CONTINUE backend-agent to Phase 6
Wave 3 → Wave 4:
IF EXECUTION-STATE.json phase 6 status == "completed"
THEN spawn frontend-agent
Wave 4 → Wave 5:
IF all phases 1-10 status == "completed"
THEN spawn test-agent
ELSE identify failures and halt
Rollback Decision Tree
IF test-agent Phase 11 fails
├─ IF frontend-agent Phase 10 suspected
│ └─ Rollback Phase 10 only
├─ IF backend-agent Phase 2 or 6 suspected
│ └─ Rollback Phases 2 and 6
├─ IF infrastructure suspected
│ └─ Rollback Phases 1, 5, 7
└─ IF all else
└─ Full rollback to original state
See ROLLBACK-STRATEGY.md for detailed procedures.