Commit Graph

5 Commits

Author SHA1 Message Date
Eric Gullickson
9b6417379b chore: update Docker and compose files for PaddleOCR engine (refs #119)
- Replace libtesseract-dev with libgomp1 (OpenMP for PaddlePaddle)
- Pre-download PP-OCRv4 models during Docker build
- Add OCR engine env vars to all compose files (base, staging, prod)
- Add optional Google Vision secret mount (commented, enable on demand)
- Create google-vision-key.json.example placeholder

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-07 11:17:44 -06:00
Eric Gullickson
462d306783 fix: resolve staging deployment issues with Traefik, Loki, and Alloy (refs #105)
All checks were successful
Deploy to Staging / Build Images (pull_request) Successful in 1m21s
Deploy to Staging / Deploy to Staging (pull_request) Successful in 48s
Deploy to Staging / Verify Staging (pull_request) Successful in 2m37s
Deploy to Staging / Notify Staging Ready (pull_request) Successful in 8s
Deploy to Staging / Notify Staging Failure (pull_request) Has been skipped
- Exclude blue-green.yml from staging Traefik by mounting dynamic-staging/
  directory (only grafana.yml + middleware.yml) instead of dynamic/ which
  contains production-only blue-green routing config
- Disable Loki healthcheck: distroless image has no /bin/sh so CMD-SHELL
  healthchecks cannot execute; Alloy and Grafana verify Loki connectivity
- Fix Alloy healthcheck: replace wget (not in image) with bash /dev/tcp
- Add Grafana staging domain override (logs.staging.motovaultpro.com)

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-06 10:51:00 -06:00
Eric Gullickson
99ee00b225 fix: add OCR image to CI/CD workflows (refs #64)
Some checks failed
Deploy to Staging / Build Images (pull_request) Successful in 3m38s
Deploy to Staging / Deploy to Staging (pull_request) Successful in 28s
Deploy to Staging / Verify Staging (pull_request) Failing after 6s
Deploy to Staging / Notify Staging Ready (pull_request) Has been skipped
Deploy to Staging / Notify Staging Failure (pull_request) Successful in 7s
- Add OCR image build/push to staging workflow
- Add OCR service with image override to staging compose
- Add OCR service with image override to blue-green compose
- Add OCR image pull/deploy to production workflow
- Include mvp-ocr-staging in health checks

The OCR container is a shared service (like postgres/redis),
not part of blue-green deployment.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-01 13:19:30 -06:00
Eric Gullickson
20696ccbf0 fix: updates to CI/CD Paths
All checks were successful
Deploy to Staging / Build Images (push) Successful in 21s
Deploy to Staging / Deploy to Staging (push) Successful in 28s
Deploy to Staging / Verify Staging (push) Successful in 7s
Deploy to Staging / Notify Staging Ready (push) Successful in 6s
Deploy to Staging / Notify Staging Failure (push) Has been skipped
2025-12-30 09:15:41 -06:00
Eric Gullickson
83d79da3aa CI/CD Gitea v1.0
Some checks failed
Deploy to Staging / Build Images (push) Failing after 7s
Deploy to Staging / Deploy to Staging (push) Has been skipped
Deploy to Staging / Verify Staging (push) Has been skipped
Deploy to Staging / Notify Staging Ready (push) Has been skipped
Deploy to Staging / Notify Staging Failure (push) Failing after 6s
2025-12-29 18:51:41 -06:00